Factory Lifetime Service!
building material metal roofing panel iron steel sheet zink metal roll former forming machine Factory Price with ISO9001/Ce/SGS/Soncap
Why choose this machine?
1.Certificate: ISO 9001, CE,
2. Lifetime seivices
3. Roller cover with 0.05mm chrome; 72mm diameter solid steel shaft. Lifetime>10years.
4. Introduced Mitsubishi PLC with touch screen to machine controll system.
5. One worker operation (minimum)
6. Cr12 mould steel cutter with quenched treatment. Cutting blade with heat treatment.
7. Product cut-to-length.
8.Technician overseas installing and training available
Item |
Specification |
Raw Material |
Type |
Pre-painted steel coil & galvanized coils |
Thickness(mm) |
0.3-0.7 |
Yield strength(mpa) |
235-550 |
Roller material |
45# steel , coated with Chrome |
Shaft for rollers |
Solid shaft with 72mm,processed with cylindrical grinder |
Forming speed(m/min) |
About 20-25 |
Output speed(m/min) |
About 12 for 6m length sheet |
Speed adjusting mode |
Mitsubishi frequency transformer |
Roller drive |
Decelerating motor + Chain drive |
Cutting mode |
Hydraulic cutting |
Cutter material |
Cr12 mould steel |
Length measurement |
Nemicon Encoder |
Control mode |
Mitsubishi PLC |
Operating mode |
Button + Mitsubishi Touch screen |
Main motor power(kw) |
7.5KW |
Components
Decoiler (manual decoiler and hydraulic decoiler for option) |
1set |
Feeding & guiding device |
1set |
Main roll forming machine |
1set |
Hydraulic cutting system |
1set |
Controlling system |
1set |
Run out table (auto. Stacker for option) |
1set |
Controller:
We choose Mitsubishi PLC from Japan.
The PLC controller is the "CPU" of forming machine. Machine excellence performance need the supports of excellence PLC.
With touch screen mode, let your workers enjoy the easy operation; with auto working mode, let your workers free their hands!
Packing:
1. One 40feet container for loading one set machine with decoiler.
2. Main machine body and decoiler is load naked (tighten to container with steel wire rope).
3. Spare parts and operating tools are loading in tooling box.
Delivery : about 50 days
About us
We are professional in making roll forming machines since 2003. Company occupies 6650, in which 5650 for workshops.
1. Capacity: 12-15 sets/month
2. Delivery: in only 5-8 weeks for urgent order
3. Have our own tool center. 12 sets CNC machines.
4. Zhongyuan is a "All-in-house source"
--from raw material to the final high-precision forming machine. We have our precise tooling center.
5. You can rely on our team!
We have engineers with experience more than 15 years in metal forming industry.
Get Free:
profile drawing & machine design technical support by our 15 year experience technicians!